Karachi: The Sindh Mass Transit Authority (SMTA) has invited expressions of interest (EOIs) for consultants that will be tasked with providing detailed design preparation; along with the procurement of support and construction supervision services — according to a publication.
Read: Sindh govt directs to operationalise Green Line BRT by March 2020
The EOIs were invited after the World Bank (WB) approved the funds for the Yellow Bus Rapid Transit (BRT) project. As per the details, the project will include the construction of a 21-kilometre-long corridor, starting from the Dawood Chowrangi to Numaish, and is part of the overall Karachi Mass Transit System. The project also includes the construction of two bus depots and development work to improve the 67-kilometre-long smaller off-corridor roads that are to be used as direct and feeder routes.
Read: Sindh Govt initiates work on Red Line BRT project
The scope of the services required are as follows:
- To prepare a detailed design covering Yellow BRT Corridor and off-corridors.
- To formulate construction contracts and bidding documents, and to provide necessary procurement and technical aid to the SMTA during the bidding.
- To prepare requirements and supervise works for a part of the project, which is to be undertaken through a Design-Built contract.
- To supervise project construction and implement Building Information Modelling for constructing the project digitally, and use this model to support stakeholders until project completion.
The estimated duration of the project is 60 months from the contract signing to the Defect Notification Period (DNP). Interest forms are required to submit all pertinent information demonstrating the required qualifications of aforementioned consultant. The terms of reference (TORs) can be found on https://www.karachibreeze.pk/smta/ under Yellow BRT or from the office of Director Projects/ Infrastructures SMTA.