Lahore: The trial run of Orange Line Metro Train (OLMT) is all set to begin today, a news source reported. The preparations are complete for the Chief Minister Punjab Shahbaz Sharif and Chinese Consulate General to travel between Dera Gujran and Lakhshmi Chowk.
According to the details, previously OLMT trial run was to be conducted on May 17, 2018. However, due to Ramzan, the schedule was changed to May 16th. The CM will address the gather at Lakhsmi Chowk Station at 4 pm, after reaching there.