Karachi – A detailed survey was conducted on the structural stability of Jam Sadiq Bridge by an engineering consultancy firm. The result of the survey confirmed structural stability of the bridge.
However, for repairing the bridge, the consultancy firm estimated an amount of over Rs. 60 million. Abdur Rauf Akhtar, Karachi Administrator, said that after 2004 this was the second survey conducted on the bridge. He said repair works on the bridge would include replacement of expansion joints, deck slab repairs and correction of drainage system.
Related News
Zain Nadeem
Zain Nadeem is a Deputy Editor at Zameen Media (Pvt) Ltd. You can also find and follow him on Google+