Gujranwala: Master City Gujranwala developers have announced in a publication that utility gas supply, from the Sui Northern Gas Pipeline Ltd (SNGPL), to the project will begin between March 20 and March 25.
Round-the-clock electricity supply from the Gujranwala Electric Power Company (GEPCO) will soon follow.
The gas connection for Master City was approved in March last year. Work was being done to facilitate the supply of gas to the project ever since.
Read: Master City Gujranwala: All the news you need right now
Master City Gujranwala is located off the Sialkot Bypass. It is situated on the other side of the Upper Chenab Canal, and is connected to the bridge via the bypass mentioned. Previously, the society administration had obtained permission to connect the housing scheme through the bridge.
Reportedly, the housing scheme also comes equipped with a food court and several restaurants. One of the primary attractions of the food court has been its laser park facility, which features laser shows every weekend.