I want to build house in b-17 e-block on 30*60 plot.What will be cost?.Please provide stage wise cost for example what will be cost till structure and till finish?

Grey Structure Cost Rs.1350/sq ft to Rs.1550/sq ft depends on

design and actual site conditions/soil test report.

A grade finishes starts Rs.2500/sq ft to no limit depends on finishes you select.

We can give you design and construction services at one place.

If interested contact us

Team dSA

www.designsource.com.pk

Cost varie as per your selection of material and design of material. You can visit Redirecting.... They are good professionals and working for several years in this field. You may contact them at 042-36655262 or send your contact number at hamza.asif@ameradnan.com for detailed discussion or meeting.

structure 1250 per sq ft

complete 2450 per sq ft

labor rate 290 per sq ft

AOA

No compromise on quality we have been working since 35 years, u can see our work in DHA Rawalpindi and many other place in Rawalpindi and Islamabad.

Labor Rates 375........(Without Material):

Shed to shed

With Material 2800. (Finishing)

Shed to shed

We Create Inspiring buildings which maximize the return on investment for our clients

Please const us for residential and commercial projects

Warm Regards

KD Constructions

C:00923005508033

T:051-5384438, F:051-5524233

khurram.satti@hotmail.com

Dear

Grey Structure Cost Rs.1100/sq ft to Rs.1250/sq ft

Turnkey Cost Rs. 2140/sq ft A Category

Labor Rate Rs. 290/sq

Regards

Ahmad Sajjad

03334666073

sajjad@engspirit.com

www.engspirit.com

Dear All aoa

We are planning to build a school building & we need some sincere advice as we are working on very tight budget.

Building size 100ft x 43ft (4500 sq ft)

Total 8 rooms each room 25ft 18ft

There gonna be 4 rooms each side and will have 7ft wide walking passage between rooms. Almost same as shopping markets you walk in and you have shops on your both sides right and left.

So When you walk in the passage you will have class rooms on your right and left,

Whole buildings load will be put on columns/pillars and walls will be non load bearing.

In your opinion how much money we will need to finish this project.

4 ligts and two fans each room, plaster in and outside of the building plus paint the whole building, normal floor (fursh)

Thanks

Mohammed

Rawalpindi

Dear,

Labor Rate 285 sft

with material 1750 sft

Regards,

Ahmad Sajjad

sajjad@engspirit.com