Today visited Mumtaz City and it was a pleasant visit, development work was very good, 3 blocks there Chanab Block, Ravi Block and Indus Block. Chanab Block development work is almost complete. MMC was doing black top on streets, park developed there, LED street lights are installed there not only installed was functional after Maghrib Azan. They made separate paths for drainage. Very impressive development work so far.
People who have plots in Chanab blocks should wait for a little time as possession is almost ready and MC will handover possession in end of December InshaAllah.