I wanto know the list of material required to build a five marla home double story i wish if you tell me
Foundation: bricks, cement , others
Walls 9 inch: bricks. Cement. Others
Lenter: sarya, concrete, cement sand and others
I will be highly obliged
It is not good 16 visits and no suggesion
Dear kahn ji
its a materialistic period so you can understand what i mean to say.....
you didnt mention your drawing. Anyhow
if you have your plot on ground level then you need almost 2 and half trolly of bricks for your foundation only.
and DPC to first lenter again you need 3 trolly approx. And so on ....up to 2nd lenter
Khan sab razi rahna ub
Thanx specially for being so honest in answering
We are working as interior designer and construction company for several years and constructed many homes and hotels in this era. We have a wide range of material and designs for you so we can arrange a meeting to discus in details if you have time. We would like to build your home with latest and unique interior designing ideas. You can see our work by visiting https://www.facebook.com/AmerAdnanAssociates. Send your contact details to set a meeting at hamza.asif@ameradnan.com or call on 04236655262.
We are from Alliance cables
if you need any assistance for electric wiring please contact our experts, we just provide qulity cables but we guide you for a better option. Thanks
Abdul Majeed
03224949452
Roots Engineering Services is providing the construction services to our prestigious client for several years . I offer my services to build new house with A+ GRADE Construction as follows
GREY STRUCTURE WITH MATERIAL
WORK INCLUDED
(Rs.1125/sft)
Super Structure
• Thick masonry up to ceiling level.
• RCC/RBC slabs, Lintels Beams
Surface Rendering
• Application of cement plaster to all the ceilings, internal and external wall surfaces
Flooring
• Compaction of Backfill material, dressing , leveling.
• Laying of Brick Ballast.
• Laying of 2” PCC under flooring
Roof Insulation
• Includes cleaning, coats of hot bitumen, one layer of polythene sheet,
• and 3” to 4” thick mud laid in slope, laying and grouting of 1- 1/2” thick brick tiles.
Electrification
• Conducting, wirings, DB’s fixing only
Plumbing Work
• Sewer Line, Man Holes, Baths hot and cold water pipe lines, overhead pipe line , rain water.
• pipe only( PPR and UPVC Fittings)
FINSIHIG JOB WORK INCLUDED
WITH MATERIAL
(Rs.1790 to 2870/sft)
(Include Grey Structure Work & As Mention Below)
• Wood work
• Lassani / High Glass Sheet.
• Frame wood Kail AAA.
• Rooms Wardrobes.
• Kitchen Cabin
• Tv launch Section.
• Doors Skin Panel (Malaysian)
• Solid Wood Construction
• Windows
Aluminum work for All home Windows and Glass (ghani)
• RAILING / STAIR
Steel staircase.
• Face work Front Elevation
• Depending upon your design, combination of tiles, stone, graphy etc.
• Fancy fire places
• Installation of fire place
• Floor Marble.
• Floor Marble / Tile.
• Bath Room Tile Flooring.
• Shower sets Master / Sonex
• Bathroom tiles
• Bathroom Vanities, Commode, Basin PORTA
• Accessories
• Fixtures and accessories of baths, kitchen. Stainless Steel
• False ceiling depending upon…
BASEMENT CONSTRUCTION
WITH MATERIAL
(Rs2800 to 4000 /sft)
NOTE
With awal number bricks and using standard ratio of sand + cement.
Free to ask any question regarding construct new build home
You can construct your own house under your supervision as well if you have any doubt
Wood work construction normal to solid , from chip board to MDF lassani sheets / kail / diyar afghani / Aish wood fully solid wood / UV sheets
Floor & bath room tiles from terrazzo 4” * 12” to ”24” * 24” AND marble to granite
Shower sets from Rs.5000 to 25000 …..
And lots off more differentiate between items rate ….which cause to make the fluctuate the rate Rs.1790 to 2870
Regards
Faheam: 03217867889
For walls, definitely used Eco Blocks. They have 8.5" thickness version. You can build a house in 30 days, from DPC level!
See https://www.facebook.com/ecoenterprisesltd/?hc_ref=SEARCH
@ sara
The interlocking blocks you have mentioned on your website, Do you also have trained labor for construction with interlocking blocks.
It will be a huge savings in construction. If your only providing the material and not the trained labor than its would be very difficult for any one to avail your services.
In case 1 client out of 10 request interlocking blocks than giving the required training would be very expensive for the contractor.
I will look forward to your reply
Best Regards
Kindly mention the price of each block with sizes.