Pls tell me the labor rate contract (without material) incuding:-
Grey structure
Plaster
Wiring
Pip fitting water,electric, gas ,drain
Marbal/tile
Boundary wall
Septic tank
Main gate
Water tank
For civil works ir is Rs.250 to Rs.300/sq ft
For plumbing and Electrical contractor will be different and their charges will be deceided
lumpsum. Or max Rs.25/sq ft for complete GI/CI and fixing accessories and for electical wiring,conduting,lights and fixtures.
Regards
Roots Engineering Services is providing the construction services to our prestigious client for several years . I offer my services to build new house with A+ GRADE Construction as follows
A - GREY STRUCTURE WITH MATERIAL (Rs.1150/sft)
WORK INCLUDED
Super Structure
• Thick masonry up to ceiling level.
• RCC/RBC slabs, Lintels Beams
Surface Rendering
• Application of cement plaster to all the ceilings, internal and external wall surfaces
Flooring
• Compaction of Backfill material, dressing , leveling.
• Laying of Brick Ballast.
• Laying of 2” PCC under flooring
Roof Insulation
• Includes cleaning, coats of hot bitumen, one layer of polythene sheet,
• and 3” to 4” thick mud laid in slope, laying and grouting of 1- 1/2” thick brick tiles.
Electrification
• Conducting, wirings, DB’s fixing only
Plumbing Work
• Sewer Line, Man Holes, Baths hot and cold water pipe lines, overhead pipe line , rain water.
• pipe only( PPR and UPVC Fittings)
B - FINSIHIG JOB WORK INCLUDED (Rs.2070/sft)
WITH MATERIAL
(Include Grey Structure Work & As Mention Below)
• Wood work
• Lassani / High Glass Sheet.
• Frame wood Kail AAA.
• Rooms Wardrobes.
• Kitchen Cabin
• Tv launch Section.
• Doors Skin Panel (Malaysian)
• Solid Wood Construction
• Windows
Aluminum work for All home Windows and Glass (ghani)
• RAILING / STAIR
Steel staircase.
• Face work Front Elevation
• Depending upon your design, combination of tiles, stone, graphy etc.
• Fancy fire places
• Installation of fire place
• Floor Marble.
• Floor Marble / Tile.
• Bath Room Tile Flooring.
• Shower sets Master / Sonex
• Bathroom tiles
• Bathroom Vanities, Commode, Basin PORTA
• Accessories
• Fixtures and accessories of baths, kitchen. Stainless Steel
• False ceiling depending upon…
C - BASEMENT CONSTRUCTION (Rs2800 to 4000 /sft)
WITH MATERIAL
D - LABOR RATE Rs.250/sft
everything is included as you mentioned except water tank.
NOTE
With awal number bricks and using standard ratio of sand + cement.
Free to ask any question regarding construct new build home
You can construct your own house under your supervision as well if you have any doubt
Regards
Faheam: 03217867889
We have a wide range of designs and material for your. Rates depend upon your selection of material etc. If you want then we can arrange a meeting to discuss in details. Kindly send us your contact details at hamza.aif@ameradnan.con or call at 042-36655262. You can also see our work by visiting http://www.ameradnan.com/work.