Labor only per sft cost

I have a 16-m plot in military accounts, college road, lahore. I want to build house there, the ground floor covered area is approx. 2600 sft. 1st floor is 2100 sft.

I need labor only, per sft rate for covered area, alongwith other item wise rates for main gate, boundary wall etc.

Dear Hassan Ali,

We can give you both design and construction services with or without material.

If you are interested pls contact us at designsource99@gmail.com

Awaiting

dSA

92-333-4220989

Hasan. In Islamabad labor rate for cement work including tiles etc is Rs 210-220 per sq ft for covered area. Boundary wall is said to be extra work which is calculated separately. It can be calculated as per actual basis like total labor involved plus 10% profit of contractor.

Roots Engineering Services is providing the construction services to our prestigious client for several years . I offer my services to build new house with A+ GRADE Construction as follows

LABOR RATE Rs.300/sft

everything is included in this above labor rate of covered area and uncovered area jobs, like boundary wall, side pasage, back yard, floor tiling septic tank, etc...

GREY STRUCTURE WITH MATERIAL

WORK INCLUDED

Super Structure

• Thick masonry up to ceiling level.

• RCC/RBC slabs, Lintels Beams

Surface Rendering

• Application of cement plaster to all the ceilings, internal and external wall surfaces

Flooring

• Compaction of Backfill material, dressing , leveling.

• Laying of Brick Ballast.

• Laying of 2” PCC under flooring

Roof Insulation

• Includes cleaning, coats of hot bitumen, one layer of polythene sheet,

• and 3” to 4” thick mud laid in slope, laying and grouting of 1- 1/2” thick brick tiles.

Electrification

• Conducting, wirings, DB’s fixing only

Plumbing Work

• Sewer Line, Man Holes, Baths hot and cold water pipe lines, overhead pipe line , rain water.

• pipe only( PPR and PVC Fittings Popular at least)

FINSIHIG JOB WORK INCLUDED

WITH MATERIAL

(Include Grey Structure Work & As Mention Below)

• Wood work

• Lassani / High Glass Sheet.

• Frame wood Kail AAA.

• Rooms Wardrobes.

• Kitchen Cabin

• Tv launch Section.

• Doors Skin Panel (Malaysian)

• Windows

Aluminum work for All home Windows and Glass (ghani)

• RAILING / STAIR

Steel staircase.

• Face work Front Elevation

• Depending upon your design, combination of tiles, stone, graphy etc.

• Fancy fire places

• Installation of fire place

• Floor Marble.

• Drive ways flooring.

• Side passage and back yard flooring.

• Terrace flooring.

• Floor Marble.

• Floor Tile.

• Bath Room Tile Flooring.

• Shower sets

• Bathroom tiles

• Bathroom Vanities, Commode, Basin

• Accessories

• Fixtures and accessories of baths, kitchen.

• False ceiling depending upon…

BASEMENT CONSTRUCTION

WITH MATERIAL

(Rs2500 to 4000 /sft)

NOTE

With awal number bricks and using standard ratio of sand + cement.

Free to ask any question regarding construct new build home

You can construct your own house under your supervision as well if you have any doubt

Regards

Faheam: 03217867889

rootsengineerings@gmail.com

We are working as an interior designer and construction company for several years. We have a wide range of design and material for you that will be selected after a detailed meeting with you. Kindly send us your contact number so that we could talk in details or call on 0423-6655262 for more assistance. You can see our work by visiting Redirecting... and http://www.ameradnan.com/work.

Please Contact Me My Number 03329999173

Labour Rate = 230 PKR/SFT

Boudary wall and other item s will be charged on Item Rate after discussion.

Regards,

Engr. Shahid Kamran

Engineering Development Associates

Eden Boulevard College Road Lahore

+92-3016070855

Hasan instead of giving expensive contract to hi-fi design/contracting firms, you can simply hire an experienced mistri and ask him to do it with daily wages good labourers. But you will have to make sure the mistri is a good man and you will have to supervise by yourself (also get some engineer’s help to do a few visits every two weeks).