Things done:
1) Cemented the house.
2) Floor ka kacha ho gya hai, gate lag gya hai.
Things left (Everything will be single):
1) Marbling
2) Kitchen
3) 3 Baths
4) Wood works
5) GI piping
6) Paint
7) And everything else you can think off.
So how much do I need more to develop a 'single storey' 2450 sq feet with 35 70 structure.
1-2 million
It depends upon the material and design that you select for your home. If you want to discuss in details then send me your contact number at hamza.asif@ameradnan.com or call at 0423-6655262. It will be more useful. If you want to see our work then you can visit Redirecting....
It can be between 2 to 2.5 mil with medium quality finishes…
3500 per sq/ft is the rate of a well constructed house. If you are interested the we will arrange meeting.