House construction in dha islamabad

Dear experts,

I am about to start construction of a 1 kanal house in dha islamabad. Covered area is approx 6500 sq ft. With half basement of approx. 1200 sq. Ft. I am first planning to complete gray structure. Please advise if i should do a turnkey contract for complete gray structure or i should only give labor contract and buy material myself. Will be great if you can give approx cost of materials per square fee. Thanks!!!

Do you need sany excavator or concrete pump?

I suggest you to give on turn key basis to avoid further hassle but sign contract with all scope of works with specs and all design should be finalized.

We can give you complete turn key solution at one place.

If interested contact us with confidence.

Regards

dSA

92-333-4220989

designsource99@gmail.com

Dear Sir,

Planet Builders and Interiors is a well-established construction company operating by the team of dedicated and experienced architects, B.SC Civil engineers and professional staff.

We are pleased to offer you the best possible prices of quality work. A Grade Grey Structures rate Rs. 1350 per Sqft covered area including basement. (Negotiatable).

Multiply this figure with the Drawings covered area of your plot for cost information up to greystructure complition level.

Labour rate will be 350/- per Sqft.

Bsc Civil Engineer (Registered with Pakistan Engineering Council) consultancy services included in rate, which will ensure the safety measures, the quality of material & work, and 100% practical implimentation of architecture drawings as well.

We are also providing Turnkey services as per your need, proposals with complete information will be forward for these pakeges upon your inquairy.

Hoping for further comunication and meeting with your good self soon.

Regards,

Planet Builders.

Gmail ID: planetbuilderss@gmail.com

Facebook: "Azhar Builders" and page "Planet Builders"

M. Azhar Khan

Founder

0321-8837696

Hafiz Umar Khan

B.Sc. Civil Engineer

0332-4664243

Dear sir

For grey structure of basement with material i will quote you 1650/sqft

Ground floor , first floor and mumty 1250/sqft.

And labor rate will be 260/ sqft which includes grey structure tile/marble fixing

If you can give sufficient time and know where to buy good materials from then labor rate option is better and cheaper.

PAK BUILDERS...

03341054753

GREY STRUCTURE=1240/sqft

LABOUR RATE=280sqft

STRUCTURE=150sqft

It is very hard to find out a reliable company or contractor to construct your dream home. I would like to recommend you Amer Adnan Associates - an award winning architectural design and construction firm in Pakistan. You can see their work on their website and facebook page (Redirecting...). You will really find them good. Contact now at hamza.asif@ameradnan.com for more information or call 042-36655262 for detailed discussion.

Salam to all,

can any one send me BOQ for my 40x80 plot construction,

covered Aria (37 x 61)total = 4773 sft.

6 bed, 6 bath, 2 DD, 2 Kitchen , mumty with bath.

HT @ special request

My Email. Khanz0969@yahoo.com

InshAllah, I will email it to you by tomorrow.

Salam HT,

thnxxxxx a lot for ur help.

after eid In Sha Allah I will start construction of house and let u know about.

Dear Sir,

We Guarantee professional services since

We are a team of architects providing solutions from design to execution, Residential / House design, Commercial design etc, Services we provide are

Architecture Design

2D Plans

3D elevations

Structure Design

Submission Drawings

Construction Drawings

0331-5143994

facebook.com/archinnn

Grey Structure mai kia kia cheez include hoti hai?

?

Hello dear,

as you told,it is suggested if you can have full time for supervision and you are expert than you can experience it by your own.

If you want to have tension free and in time construction than give it to turn key basis but care must be taken at time of contract agreement. All the things, responsibilities,rights and obligations must be in black & white.

All the best

Regards.

Abdul Qadeer

0333-8003637

Please contact Muhammad Waqas 0322-6251601 for excellent quality of work and satisfaction. They work on both labour and with material/turn key basis.

I also do the Construction work but my first advise to you would be that if you can spare time for yourself than its better to give the project on labour rate and get the material yourself. If you cannot spent the time than better to give the contract to better comapnay by seeing there work.

Labour rate without material= 250-280 Sqft (depending upon the quality of Work)
Labour rate with material = 1500 - 1700 Sqft (depending upon the quality)

AM Abbasi…Sir it means that A class construction can be achieved for 2000/sqft if the house is constructed on labor rate with strict checks and material controls with okay soil conditions…

ESPL- Offer (Your Dream Home) 05 Years Monthly Installments,

( Construction of house is free from curse of interest )

You can build 3 to 10 Marla, own house with only 60% of construction Cost, & 40% amount shall be recovered ESPL in 5 Years on monthly or quarterly installments.

You can build his own house on his plot with only 60% of construction cost and the remaining 40% amount shall be invest by ESPL

Category:

A- 1850/sqft

A+ 2550/sqft

A++ 3450/sqft

contact@engspirit.com

+92-300-7992211

+92-300-5589001

+92-303-4590967

Rs.1900/ sft basement

Rs.1200/ sft ground floor

Rs.1220/ sft first floor