Aoa friends,

I have a 10-Marla plot in Bahria Town Rawalpindi Phase-8 and I need to know the cost of foundation for a double storey house. The plot size is 35x70 (sq ft).

Please suggest.

Asim

We have a lot of options for you. A wide range of material and design is available for you if you are interested. If you want to discuss in details then send me your contact details to arrange a meeting at hamza.asif@ameradnan.com or call us at 0423-6655262. It will be more comfortable to discuss on call.

Regards,

Hamza Asif

http://www.ameradnan.com

Dear Hamza Asif Sahab,

Thanks for your reply. Your company seems to be based in Lahore where as my plot is located in BT Rawalpindi. Do you work for Rawalpindi as well?

Regards,

Asim

Yes, we have already done many big projects in RAWALPINDI. So, you can trust on us and make an appointment with our CEO to discuss in details.

Dear sir ,

cost of you base work can be easily calculated if you can update me with the foundation drawings

(.)3 dumpers of crush 2 dumpers of sand would be more then enough . This excludes the concrete walls base front,back and open side ,

(.)steel approx 3 ton no 3 and 1.5 ton no 4

please note : this steel Woking is on the assumption that the plot is dug about 6 feet and boundary walls are bought to the road levels only

(.)around 12000 bricks will be required

(.)excavation ,back fill, level, roller for compaction, and gravel provided by them as well 12 loads only , will cost you around 90 to 100k

(.)termite treatment 10k ( on the basis of 9 ltr chemical used )

(.)compaction test 10k

labour is not to be paid as when you agree to labour on for example 120/square feet, the base labour comes within .

THIS ALL WOULD SUM UP TO AS FOLLOWS :

(.)sand 850 x 2 x 19 = 28500

(.)crush 850 x 3 x 29 = 65250

(.)cement 280 x 495 = 137200

(.)termite =10000

(.)compaction test =10000

(.)excivation (All) =100000

(.)steel(rebars) =387000

calculating without drawing(ittahad steel)

(.)labour =25000

might ask for an extra

(.)bricks 12000x 8 = 96000

TOTAL COST [[[ 858950 ]]]

I hope the purpose of my post have well served your query still if further information required please feel free to contact me

regards

Pasha

03005344500

OH AND I CAN SAY THE COST ESTIMATIONS AS I HAVE SOME ON GOING PROJECTS THERE IN PHASE 8 SECTOR C AND OVERSEAS SECTOR 7

REGRAD

PASHA

SIR,

A VERY USEFUL WEBSITE IF SHARE MY MAP WITH YOU. CAN YOU SUGGEST ME THE COST OF IT.?

Yes sure why not . You can email me at

Midlinke@dsl.net.pk

Regards

Pasha

PASHA,

I HAVE SEND YOU SEND YOU MY MAP COULD YOU SUGGEST ME THE COST OF BUILDIN FIRST FLOOR.

THANKS

FARHAN

Mr. Khan

I'm writing you this on behalf of Clare Builders Pvt. Ltd. We are SECP certified company delivering quality and values simultaneously. For our company profile and background you can visit our website at www.clarebuilders.com.

We can give you decent estimate after knowing some required information regarding your construction project.For that I need your contact e-mail ,your number and best time to reach you. One of our representative will reach you with in 24 hr.

We already have on-going as well as completed projects in Bahria town. It would be our pleasure to serve you within your time limit.

Regards,

Faiza Zahid

Head of operations and marketing

Clare Builders

E-mail: contact@clarebuilders.com

cell: +92-334-8531536