I am planning to build my first floor of my house measuring 240 yards. What are the prevailing rates of construction cost with labor + material and only labor. How 240 yards can be converted into sq. feet?

Kindly read the following articles on construction material costs. I hope this would be helpful.

A brief autopsy of construction material prices

A deeper autopsy of construction material costs

Cost vary according to your selection of material and design that you like for your house. We have a wide range of material and design, so if you are interested then we can arrange a meeting to discuss in details. Send us your contact details at hamza.asif@ameradnan.com or call at 0423-6655262 for more convenience. You can see our sample work at Redirecting....

Mr Khaliq will you please confirm is it 240 yards or sq yards?

240 sq. Yards

240 sq yards will be 2160 sq ft and construction cost of labor + material will be 2700 to 3000 per sq ft.

FIRST FLOOR

PLOT SIZE= 240 SQ. YARDS

COVERED AREA 1750 SQ. FTS.

Schedule of RCC

RCC Column 6x18: 6 Nos. 1/2 BARS 1/4 @ 8 G/C RINGS

RCC BEAM 6x36: 3 NOS 1/2 BOTT 2 NOS 1/2 TOP 1/4 @ 6 to 9 G/C

RCC SLAB : 6 THICK 1/2 bars @ 6"gc s.way 1/2 BARS @ 9" G/C S.WAY.

Can anyone calculate the approx. Tons of steel, cement, crush, sand, gravel required and the labor cost per sq. Feet to build the structure of the first floor building.

I will be thankful.