Aoa
I need to construct a house in bahria town, phase-8, rawalpindi.
Just wanted to know if any one can please shed some light on the cost per square foot for the following floors of a house?
1. Basement
Structural cost per square foot:
Finishing cost per square foot:
2. Ground floor
Structural cost per square foot:
Finishing cost per square foot:
3. First floor
Structural cost per square foot:
Finishing cost per square foot:
Any help in this regard is highly appreciated.
Best regards
Basement Rs.1750 to Rs.2000/sq ft
Gf/FF Rs.1350 to Rs.1550/ sq ft
It depends on design and actual site condition soil test report.
We can give you design and construction services at one place.
Contact us if interested.
Regards
dSA
92-333-4220989
Dear DSA,
Is there any significant saving if we build half basement or 1/3 basement? The reason I ask is that two main walls and steel requirement for the two walls will be the same. Only the side walls will be reduced in length. So is it a better idea to go for full basement or no basement?
What are your views?
@ DSA
Thank you for the reply.
Have you mentioned the cost per square foot for structure or finished house(i mean turn key solution)?
Dear, Mr.Adil,
We are Engineers and contractors having vast experience.we deal in design,Construction & renovation.
The structural cost of basment is 1400/sft. Approximately it also depends on structural drawings.
The structural cost of Gf/FF is 1200/sft.
The cost of standard finished house will be 2200---2400 (you can go as high as you can its up to you.)
we are already working in phase-8 you can also visit our project sites to see the quality of our work.
Thanks & Regards,
Danish Brothers Construction proffesional
Engr. Muhammad Shafqat
0322-5017254
Recently we have constructed a luxury home in Rawalpindi and you can see pics at https://www.facebook.com/AmerAdnanAssociates/. Construction cost depends upon quality of material and design that you select for your dream home. We have a wide range in it and would like to work for you. If you are interested then kindly send us your contact details at hamza.asif@ameradnan.com or call on 042-36655262 for more information.
Structural Cost of basement 1750/ Sqft
Structural Cost of GF / FF 1400 /sqft
Complete Finish overall cost is 2300- 2500/sqft ( depends upon material there are other option of %age work with complete building management)
but final rates can only be decided once studying the design and your requirements.