I am planning to construction home for myself in Umer block phase 8, covered area is about 3800 sq ft can you please advise me about the approx quantity of material to be used and if i am supplying the material what would be the estimated cost if i use only locally made items
Its impossible to give you a material estimate without the drawing but in cost wise you would have spend 33 lacs by the time you come to grey structure stage.
Than finishing depends on your requirement starting from 20 lacs to anything...
Roots Engineering Services is providing the construction services to our prestigious client for several years . I offer my services to build new house with A+ GRADE Construction as follows
WORK INCLUDED
Super Structure
• Thick masonry up to ceiling level.
• RCC/RBC slabs, Lintels Beams
Surface Rendering
•Application of cement plaster to all the ceilings, internal and external wall surfaces
Flooring
•Compaction of Backfill material, dressing , leveling.
•Laying of Brick Ballast.
•Laying of 2” PCC under flooring
Roof Insulation
•Includes cleaning, coats of hot bitumen, one layer of polythene sheet,
•and 3” to 4” thick mud laid in slope, laying and grouting of 1- 1/2” thick brick tiles.
Electrification
•Conducting, wirings, DB’s fixing only (GM Cable at least)
Plumbing Work
•Sewer Line, Man Holes, Baths hot and cold water pipe lines, overhead pipe line , rain water.
•pipe only( PPR and PVC Fittings Popular at least)
Wood work
•Lassani / High Glass Sheet.
•Frame wood Kail AAA.
•Rooms Wardrobes.
•Kitchen Cabin
•Tv launch Section.
•Doors Skin Panel (Malaysian)
Windows
•Aluminum work for All home Windows and Glass (ghani)
•RAILING / STAIR
Steel staircase.
Face work Front Elevation
•Depending upon your design, combination of tiles, stone, graphy etc.
Floor Marble.
•Drive ways flooring.
•Side passage and back yard flooring.
•Terrace flooring.
•Floor Marble.
•Floor Tile.
Bath Room Tile Flooring.
•Shower sets
•Bathroom tiles
•Bathroom Vanities, Commode, Basin
Accessories
•Fixtures and accessories of baths, kitchen.
•False ceiling depending upon…
BASEMENT CONSTRUCTION
WITH MATERIAL
(Rs2500 to 4000 /sft)
NOTE
With awal number bricks and using standard ratio of sand + cement.
Free to ask any question regarding construct new build home
You can construct your own house under your supervision as well if you have any doubt
you please email on air so that every one can discuss you send their own project details to you.
Regards
Faheam: 03217867889
We have a wide range of material and design for you if you are interested in design as well. You can see our sample work by visiting Redirecting.... Moreover, we can provide you exact rate after a meeting with you after knowing your interest. Kindly send us your contact number at hamza.asif@ameradnan.com or call at 04236655262 to discus in details. It will be more useful because rates vary according to your requirements for your dream home construction.
Dear Sir,
It starts Rs.2200/sq ft to no limit. This is with A grade finishes.
If you want design and construction services contact us.
Regards
dSA
92-333-4220989
Good Details Mr Faheem @ Roots Engineering Services
For basement construction you mentioned rates but for other areas for A+ GRADE Construction ,you did not.
Please mention the rates
Also please let me know what will be the completion time for a One Kanal House in Bahria having Ground floor, First floor & Mumty and covered area of approximatly 5800 square foot
Thanks
Please read the following posts on construction materials:
A brief autopsy of construction material prices
A deeper autopsy of construction costs
I hope these posts would prove to be helpful.
Regards,
zain Nadeem
One Kanal house can be completed in 1 Year....Fully finished.
Regards
We sell all types of building material , Crush, sand , bricks Cement, Sarya of all grades at reasonable prices on cash basis
03325578453
Roots Engineering Services is providing the construction services to our prestigious client for several years . I offer my services to build new house with A+ GRADE Construction with material as follows
A. GREY STRUCTURE WITH MATERIAL (Rs.1350/sft)
WORK INCLUDED
Super Structure
Surface Rendering
Flooring
Roof Insulation
Electrification
Plumbing Work
B. TURN KEY BASE OR WITH MATERIAL (Rs.2500 to 2800/sft)
WORK INCLUDED
(Include Grey Structure Work & As Mention Below)
- Wood work
Skin panel doors
Solid doors aish wood / kail (increase the rate per square feet)
Client demands
Aluminum work for All home Windows and Glass (ghani)
Steel staircase.
Face work depending upon your map.
Floor Marble.
Bath Room Tile Flooring.
Fixtures and accessories of baths, kitchen.
False ceiling depending upon…
C. BASEMENT CONSTRUCTION (Rs2500 to 4000 /sft)
(Turn Key Base Or With Material
Grey structure & Finishing work)
NOTE
With awal number bricks and using standard ratio of sand + cement.
Free to ask any question regarding construct new build home
You can construct your own house under your supervision as well if you have any doubt
Regards
Faheam: 03217867889
Can you provide estimate of cost of 8 marla house in khalid block bahria town rawalpindi
Your looking at 1100 to 1200 for grey structure …finishing depends on your choice starting from 600 and above