Hello,
I want to build an house in behria town phase 8 abu bakr block. There are 18 rcc piles an rest of the piles are pcc approx 24 piles depth upto solid strata approx 16m with dia 15inch.
What will be approx cost for excavation, piling , rafting and grey structure (labour rate only).
I need contractor rates for above work.
Jazak allah
Dear Qaiser Sb,
We can give you complete design and execution services at one place and if you are interested pls contact us for further discussion.
Looking forward
Team dSA
92-333-4220989
Did you get the contractor?
Nope not yet, I didn’t find out proper financial estimate.My budget is limited i want to build only structure
Grey structure cost is Rs.325/sft (labour rate). Following works are included in grey structure:
Footings/raft, walls, columns, beams, roof slabs, under ground & overhead water tanks, septic tanks, stairs,DPC/ water proofing of foundations, Anti termite treatment,screed concrete on top roof, sewerage & sanitary works, laying water supply pipes, gas supply pipes, fixing door frames(chokhats),Laying conduits in walls & slabs, fixing back boxes in walls plaster.
Danish, 03465107561
Please share the map with us and we will give exact estimate. Labour rate is 325 to 350 depending upon which type of work at your house.
Hello Mr. Qaisar
If you need with material construction cost than you can send me drawings so we can give you detail rates of your grey structure.
To get info regarding rates and how to reduce cost you can visit our office for consultation.
Regards,
Ar. Wahab
Arch Five Architects
0321-5674022
wahab.arch@gmail.com