1 Kanal Grey Structure Construction Cost in Lahore
Quick Options
Kanal
Prices last updated on 1st November, 2024
Total Cost
1.71 Crore
Grey Structure Material Cost
1.41 Crore
Labour Cost
30.3 Lakh
Price Per Sq Ft
2,722
Breakdown of Grey Cost By Percentage (PKR)
- Plumbing Works14.63 Lakh
- Electrical Works3.96 Lakh
- Foundation & Structure1.53 Crore
Plumbing Works
Plumbing works include underground piping and drainage systems materials.
14.63 Lakh
AC Drainage System
46.75 ThousandCold and Hot Water Supply
1.6 LakhDrainage System Piping
2.18 LakhGas Piping
2.05 LakhInsulation Armaflex
1.06 LakhPumps and Drains
3.38 LakhUPVC Pipeline for Sewerage System
1.13 LakhLabor Cost
2.77 LakhElectrical Works
Electrical works include underground wiring and all electrical items.
3.96 Lakh
Conduits & Accessories
1.45 LakhSwitches and Back Boxes
50.04 ThousandLabor Cost
2.02 LakhFoundation & Structure
Foundation & Structure includes materials for the basic house structure including foundation, floors, walls, roofing, and plastering.
1.53 Crore
Bricks, Cement, Sand, & Crush
96.54 LakhExcavation & Steel Reinforcement
28.91 LakhRoof Insulation, Termite & Water Proofing
1.9 LakhLabor Cost
25.52 LakhDisclaimer
This cost is for 1 Kanal double storey House. All the information in this calculator is published for general information purpose only. All product prices
are subject to change according to the market fluctuation and may not be 100% accurate.
Construction Cost Calculator
Want to learn more about Zameen.com’s Construction Cost Calculator and build your dream house?
Popular Calculations
Frequently Asked Questions (FAQs)
What is the cost of building 1 Kanal house grey structure in Lahore?
What is the grey structure rate in Lahore?
What is included in the grey structure?